Technical Expertise

Multidisciplinary teams comprising of specialists across ten industry sectors, we have the expertise necessary to grapple with challenging assignments.

VIEW ALL SECTORS >

Sectors

Commitment to Clients

Our business is built on relationships, and our clients will always be our top priority.

View all Projects >

Featured Project

Silvertown Tunnel London UK

Silvertown Tunnel
One of the largest engineering projects in the world.

learn more >

Who We Are

International Award-Winning Engineering Consultants who deliver ground breaking solutions at the forefront of industry best practice.

learn more >

Our Regions

Carbon Reduction Plan

About - office locations image

Our Commitment to Net Zero
ByrneLooby is committed to becoming a net zero engineering consultancy by 2040

learn more >

Stay Up-to-date

Stay on top of the latest developments, appointments, awards and more across all our offices.

View all News >

Featured News

Irish Concrete Society 40th Annual Awards

Irish Concrete Society 40th Annual Awards

ByrneLooby Celebrates Highly Commended Award for  contribution to the Blanchardstown Regional Drainage Scheme

LEARN MORE >

Investing In Our People

Cultivating a culture in which individual differences and the contributions of our staff are recognised and valued.

meet our people >

Our EDI Policy

Careers - Image

Celebrating People
Fostering a culture where you are encouraged to be yourself.

learn more >

International Presence

Multidisciplinary team comprising of specialists across Ireland, UK and the Middle East.

Follow us:

  • LinkedIn - blue70px
  • Twitter - blue70px
  • Facebook - blue70px
  • Instagram - blue70px
  • Vimeo - blue70px
  • Issuu - blue70px

 

Contact Us

We would love to hear from you. Please fill in the quick contact form below.

Send a message

Road Safety Audits

CONTACT US
Road Safety Audits

Our transport team provides independent evaluation during the design and construction of road schemes in relation to road planning design, road safety engineering (road safety audits and inspections) and traffic analysis, and assessment for both public and private sectors, identifying potential hazards to all road users. An RSA independently examines the proposed or existing piece of infrastructure in stages. These stages investigate the potential safety risk at initial design, detailed design and before opening a scheme to the public. An RSA is a statutory requirement on any schemes/developments on the national road network. RSAs can be carried out at various stages of the project lifecycle – Stage F (RSA) carried out at the feasibility stage of the project, right the way to completion of construction to ‘live’ highway and accident monitoring in the months following project completion.

The main aim of a Road Safety Audit is to ensure that road schemes operate as safe as practicable, minimise risk, conflict, collision numbers and severity and to ensure that all road users are considered and improve safety awareness in the design process.

Our transportation team works on various schemes including:

  • New highway/motorway schemes
  • Improvement schemes
  • Residential schemes
  • Shared surface schemes
  • Traffic management
  • Temporary traffic management works
  • Cycling/greenway schemes

Project Work

Presentation College - Team Member in the Road Safety Audit Stage 1-2 and Stage 3 associated with the upgrade of a local authority road and associated 4-arm roundabout to replace an existing junction.

Movilla Road Housing - Team Member in the Road Safety Audit Stage 1-2 of the proposed housing scheme along Movilla Road, Newtownards. The scheme proposed to provide a new signalised junction to facilitate the development. In addition, it was proposed to relocate 2 no. existing private junctions accessing the road.

Lisburn Town Centre Public Realm -  Participant in the Road Safety Audit Stage 2 of the public realm improvement scheme. The scheme proposed to enhance the pedestrian and traffic facilities throughout the historic Ballynahinch Town centre area.

Ballynahinch Town Centre Public Realm -  Participant in the Road Safety Audit Stage 1-2 of the public realm environmental improvement scheme. The scheme proposed to enhance the pedestrian and traffic facilities throughout the city centre shopping area of Lisburn.

Expertise In-Depth:
  • Cycling/greenway schemes
  • Improvement schemes
  • New highway/motorway schemes
  • Residential schemes
  • Shared surface schemes
  • Temporary traffic management works
  • Traffic management