Our Role
ByrneLooby in Manchester were engaged by FarransRoadbridge JV to provide temporary works design services to the Thirlmere Links Main project.
These designs have included hoardings, formwork, thrust blocks, stockpile batter assessments, a lagoon bund, a temporary dam, service supports, excavation batter assessments, earthwork reinstatement works, temporary walkways, access roads and retaining walls.
Through collaborating and communicating effectively with our client, we have been able to offer efficient design solutions that have allowed FarransRoadbridge JV to progress their construction works.