The Izz Municipal Landfill involved site investigations and pre-construction geological, hydrogeological, hydrological assessments. This represents a 20-year masterplan. Design included surface water management. Detailed design for Phase 2 included earthworks, containment engineering design and construction support, composite HDPE/GCL liner, design of environmental monitoring regime, operations plan, closure plan and surface water management.an. Closure Plan. Surface water management.

540 x 350

Our Role

ByrneLooby was appointed the design engineers for this project and conducted a wide range of activities including; desk study site evaluation, borehole investigations, hydrogeological studies, geotechnical appraisal, flood risk assessment, engineering design, preparation of the technical specification, and provision of construction support/construction quality assurance services.