Our Role
The scheme, developed and carried out by Byrne Looby and David Gibson Architects included demolition of the existing southern entrance structure and construction of two single storey buildings and courtyard area to house a multipurpose meeting room, kitchen, WCs and offices for the South London Swimming Club. The new structure consisted of a steel frame design which extends outside the building's footprint to provide the optional support for canopy cover. The structure was also designed to support a green roof. Byrne Looby are currently working on the Tooting Bec Lido Plant Room.