Our Role
The Sorting Office development site was considerably contaminated due to former uses of the dock area. The design solution, detailed by the engineer, involved the installation of a 1m wide diaphragm cut off wall to attenuate the contamination on site in order to prevent migration off site, potentially negatively impacting the nearby River Liffey.
ByrneLooby value engineered a bespoke design solution to reduce the construction programme and costs of constructing the cut off wall, detailing a cement-bentonite cut off wall which could be constructed using standard CFA piling techniques in a secant arrangement. Detailed testing and compliance inspections ensured the scheme was completed to the highest standards, with the required permeability and depths achieved to ensure the contamination is attenuated on site over the design life of the scheme.