Our Role
Our ByrneLooby team in London provided Structural engineering advice on the works. This included the addition of an external glass ‘Conservatory’ construction and excavation works for the creation of two separate swimming pools, one at basement level and one at ground level. Along with 'Plant Rooms' and 'Residential Accommodation' for each of the residential units. Internally, new steel framing achieved 10 metres clear spans for the floors was built inside the shell of the chapel to form the upper level accommodation.