North City Water Supply Scheme

North City Water Supply Scheme

The €55m North Fringe Water Supply Scheme was advanced by Dublin County Council to expand infrastructure in the region. The scheme will create a new trunk ‘ring main,’ connecting the network from different sources. ByrneLooby was appointed to provide engineering design support services to deliver 22km of water mains, a high-level water tower, pumping station and a new ground-level reservoir at Sillogue beside the M50, a busy motorway.

North City Water Supply Scheme

Our Role

Dublin City Council engaged to provide engineering design support services to deliver in excess of 22km of water mains (diameters ranging from 200mm to 800mm), a new service reservoir, water tower and pumping station, as part of the North fringe Water Supply Scheme. Our scope of works also included preparation of an Inception Report, Design Review Report, Survey and Site Investigation Detailed Design, Wayleave and Site Acquisition support, Planning Support, Health and Safety Management, Contract Documents and tender Support, Construction Administration and delivery of the final account.

North-city-water-supply-scheme-byrnelooby