Our Role
The upgrade required extensive lengths of sheet piled retaining walls set in chalk to form the new boundary of the widened motorway. We conducted a value engineering review of these retaining walls, leveraging our extensive expertise in assessing the nature of the chalk, the derived design parameters, design methodologies and pile installation techniques.