Our Role
ByrneLooby were responsible for the geotechnical design of pile groups and piles for the foundations of the new T-Pylon Overhead Lines. The new T-Pylon design is the first new pylon design in nearly 100 years according to the National Grid. The design required analysis of various load combinations to determine the pile type, configuration and base sizes to be adopted.