Our Role
ByrneLooby undertook a full Environmental Impact Assessment (EIA) including a stakeholder scoping session, an Environmental Scoping Report (ESR), an Environmental Evaluation Report (EER), and Environmental Management Plan (EMP) for operation and construction.
As part of the EER, ByrneLooby conducted various baseline studies including marine ecological surveys, water quality studies, noise monitoring, social impact studies, air quality monitoring, odour dispersion modelling, as well as 3D hydrodynamic dispersion modelling. The hydrodynamic modelling was also used to decide on the location of the outfall.
Based on the studies and environmental legislation and guidelines, ByrneLooby developed an EER and EMP to assess the potential impacts of the proposed STP: we outlined mitigation measures and best practices to minimise any negative impacts.