Our Role
ByrneLooby were appointed by the JV to undertake the design of the temporary utility diversions and the permanent utility connections. The key services we provided included utility searches, information maps and overlays, feasibility studies, capacity analysis, diversionary assessments, new connections and disconnections, unchartered services investigations, wayleave searches, utility diversion detailed design and BIM 3D modelling for all utility diversions. We also undertook the geotechnical design of the deep station boxes.