Our Role
Whilst working closely with our client, ByrneLooby developed value-engineered solutions to enhance build-ability. This proved to be a crucial part in our client successfully winning the contract. Our design contribution involved the installation of 2,750 precast driven and CFA piles to carry axial loads ranging from 55 to 255 tonnes.