Project Details
The works included civils design of crane hardstands and access tracks, drainage design (including SuDS) for the complete site, cable routes and utility trench details, civils design of public road upgrade works, the Transportation Delivery Route for the turbines along with substation design. ByrneLooby also undertook site inspections, sign offs and approvals of turbine base formation level, finished hardstand and access track surface. Throughout the design process and the construction phase, a dedicated team of civil, geotechnical & structural engineers was assigned to the project.