Our Role
ByrneLooby is the temporary works designer for Costain, providing the design of soil nails and temporary netting to support temporary slopes beneath the existing road to enable the construction of the permanent works. ByrneLooby analysed the cross sections to provide an assessment of the likely movements to ensure that the road remained serviceable. ByrneLooby defined the monitoring strategy and procedure to enable the movements to be checked to confirm that the temporary works were acting in accordance with the design.