Testimonials

  • A9 Dual Carriageway

    CLIENT TESTIMONIAL “From the very start and initial discussions through to construction on site, our experience with ByrneLooby was always positive. We found the whole team pro-active and innovative in their approach to design and construction. Where issues affecting design arose on site, the design team were always available and reacted immediately to advise and adapt design where necessary. We would have no hesitation in recommending Andy and the team at ByrneLooby to undertake temporary works design on any similar scheme.”

    . Gareth Bowditch, Section Manager
    . Wills Bros. John Paul Construction JV
  • Kent Station

    CLIENT TESTIMONIAL “ByrneLooby stand out most to us because of the knowledge and experience of their staff in geotechnical design. We would recommend ByrneLooby because of their flexibility as well as their customer service. When issues arose, as they inevitably do in civil engineering, ByrneLooby were able to review the new status and advice and / or revise the design quickly. They had a positive attitude towards problems that arose and details that needed review and revision for unforeseen reasons were dealt with in a timely manner, ensuring the project kept moving forward. The works on Kent Station involved permeation grouting, which can often be problematic, to facilitate construction of a basement below the water table. The design was ultimately successful and was the foundation to progress the project on to other stages of construction.”

    . Adrian Farry
    . SIAC Construction
  • Canada House

    CLIENT TESTIMONIAL “ByrneLooby are always willing to go the extra mile when required and are very professional to deal with. Their knowledge and previous experience with piling projects provide us with cost effective designs and they have a good team in place to look after the design and offer good after sales service too. I would recommend ByrneLooby because they are very professional, with clear designs and drawings and there is a short waiting time on any queries or design amendments.”

    . Chris Fox, Projects Manager
    . Murphy International Ltd.
  • The Abu Dhabi Plaza

    The level of expertise and commitment that ByrneLooby consulting engineers brought to our project was invaluable, with their in-depth knowledge of geotechnical solutions contributing to keeping our project on target.

    Frank Quirk – Director
    John Sisk & Son Ltd
  • Aviva Stadium

    From design to project management, ByrneLooby completed to our total satisfaction all works on the lansdowne road stadium foundation such as railway design submissions for piling activities and geotechnical/demolition works next to the rail corridor.

    Pat Molloy – Senior Project Manager
    Project Management Ltd
  • M50 Phase 2

    ByrneLooby have carried out a buildability assessment, earthworks design, steepened slope design, retaining structure design and temporary works design on the M50 Phase 2 PPP Motorway Project in Dublin in a satisfactory and technically efficient manner

    Francisco Martin De Santa Olalla – Project Chief Engineer
    FCC
  • The Shard

    CLIENT TESTIMONIAL ByrneLooby have designed the piled foundations and retaining walls for the top-down deep basement at the Shard, London Bridge, providing timely and economic solutions, expediting approval by Network Rail’s professional team and enabling the piling works to progress on programme.

    . Mark Pennington – Major Projects Design Manager
    . Stent Foundations Limited
  • M50 project

    ByrneLooby delivered cost-effective engineered solutions on time and to the highest technical standards on the design of permanent steepened earthworks, earth retaining structures and temporary excavation assessments and inspections on our large M50 project.

    Martin Maher - Director
    Siac-Ferrovial