ByrneLooby provided a full civil and structural service for this extension of Brunton Shaw’s cable manufacturing facilities in Worksop. The project was let as a design and build contract with Clugston as the main contractor. ByrneLooby provided tender design advice to help Clugston win the project and then detailed design during the works.

The project comprises a new warehouse and offices building of 2300m2 and a new factory building of 4500m2.

Five travelling cranes are included in the project with capacities of up to 160 tonnes and slab loads are up to 70kN/m2 to accommodate heavy loads from cable drums.

Detailed discussions were required with the Environment Agency and the Canal Trust to agree on drainage discharge and attenuation on the low-lying site adjacent to the canal.

 

Client: Brunton Shaw / Clugston
Architect: Ward McHugh Associates
Construction cost: £8 million